ELogs/Febian: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
(Created page with "Electronic Log for Febian == To Do == ''Last updated 06/12/23'' *'''Cable Tests''' == Upcoming Dates == ==PhD Completed==")
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Electronic Log for Febian
This is Febian's Electronic Log in completing PhD at UCL from September 2023 to September 2027


== To Do ==
== To Do ==


''Last updated 06/12/23''
''Last updated 05/02/24’’
*'''Cable Tests'''
*Module to be completed:
**COMP0210 Research Computing with C++
**SPCE0038 Machine Learning with Big Data
 
*Investigating supplied voltage to FMC and DDC Board
 
 


== Upcoming Dates ==
== Upcoming Dates ==
{| class="wikitable"
! style="text-align: center;" | Date
! style="text-align: center;" | Event
|-
|2 October 2023 || Starting PhD Journey in PBT Group at UCL
|-
|9 November 2023 || MAThRAD 2nd Workshop at Teddington
|-
|8 January 2024 || Starting Industrial Project at Peak.AI
|-
|18 - 31 January 2024 || Annual Leave (Family Vacation in US)
|-
|21-23 February 2024 || Valencian Proton Therapy Facility Workshop
|-
|25 April 2024 || CDT Industrial Partner Presentations (Peak.AI)
|-
|8 - 17 June 2024 || PTCOG62 Conference in Singapore
|}




==PhD Completed==
==PhD Completed==
*Modules Completed:
**PH4515 Statistics Course Royal Holloway
**PHAS0102 High-Performance Computing
**COMP0233 Research Software using Python
**MPHY0038 Treatment Radiation
*Reading Saad (Previous PhD student) Thesis
*Doing literature review as part of MPHY0038 Assignment on IMPT and the emergence of AI in the field.
*Testing and Categorising types of different USB-C 3.x Cable regulating in the market
**16 Cable was tested and 3 general classification of USB-C 3.x were found
*Setting up data acquisition process on MacBook M2 Chips
*Data Acquisition Process and Plotting the data using the provided code by Sonia
**Marking the USB-C configuration (which side to plug)

Latest revision as of 16:32, 28 February 2024

This is Febian's Electronic Log in completing PhD at UCL from September 2023 to September 2027

To Do

Last updated 05/02/24’’

  • Module to be completed:
    • COMP0210 Research Computing with C++
    • SPCE0038 Machine Learning with Big Data
  • Investigating supplied voltage to FMC and DDC Board


Upcoming Dates

Date Event
2 October 2023 Starting PhD Journey in PBT Group at UCL
9 November 2023 MAThRAD 2nd Workshop at Teddington
8 January 2024 Starting Industrial Project at Peak.AI
18 - 31 January 2024 Annual Leave (Family Vacation in US)
21-23 February 2024 Valencian Proton Therapy Facility Workshop
25 April 2024 CDT Industrial Partner Presentations (Peak.AI)
8 - 17 June 2024 PTCOG62 Conference in Singapore


PhD Completed

  • Modules Completed:
    • PH4515 Statistics Course Royal Holloway
    • PHAS0102 High-Performance Computing
    • COMP0233 Research Software using Python
    • MPHY0038 Treatment Radiation
  • Reading Saad (Previous PhD student) Thesis
  • Doing literature review as part of MPHY0038 Assignment on IMPT and the emergence of AI in the field.
  • Testing and Categorising types of different USB-C 3.x Cable regulating in the market
    • 16 Cable was tested and 3 general classification of USB-C 3.x were found
  • Setting up data acquisition process on MacBook M2 Chips
  • Data Acquisition Process and Plotting the data using the provided code by Sonia
    • Marking the USB-C configuration (which side to plug)