ELogs/SaadShaikh

From PBTWiki

(Difference between revisions)
Jump to: navigation, search
(High Priority)
Line 4: Line 4:
=== High Priority ===
=== High Priority ===
-
 
+
* Investigate how x-scale factor from chi-square changes with differently binned histograms to determine which y-scale method to use.
-
* Convert energy to range in XYE histogram.
+
* Plot x-scale factors against y-scale factors divided by number of counts.
-
* Plot 2D tracker histogram alongside 3D XYE histogram.
+
-
* Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker.
+
=== Low Priority ===
=== Low Priority ===
-
* Investigate how x-scale factor from chi-square changes with differently binned histograms to determine which y-scale method to use.
 
-
* Plot x-scale factors against y-scale factors divided by number of counts.
 
* Re-attempt LeCroy scope dead-time measurements.
* Re-attempt LeCroy scope dead-time measurements.
* Start final report in February.
* Start final report in February.
Line 32: Line 28:
* Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
* Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
* Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation or through peak event counting.
* Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation or through peak event counting.
 +
* Convert energy to range in XYE histogram.
 +
* Plot 2D tracker histogram alongside 3D XYE histogram.
 +
* Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker.
== Dates 2019 ==
== Dates 2019 ==

Revision as of 11:30, 29 January 2019

Electronic Log for Saad Shaikh

Contents

To Do

High Priority

  • Investigate how x-scale factor from chi-square changes with differently binned histograms to determine which y-scale method to use.
  • Plot x-scale factors against y-scale factors divided by number of counts.

Low Priority

  • Re-attempt LeCroy scope dead-time measurements.
  • Start final report in February.

Completed

  • Literature review.
  • First Birmingham experimental run.
  • Wrote code to load and plot Caen digitiser data in histograms.
  • Overhauled LeCroy data analysis routines: (short region) double baseline sigma testing, dynamic integration window allocation, empty acquisition checks.
  • Wrote code to scale and plot LeCroy & Caen data onto single plot, using approximate x and y-scale factors.
  • Wrote code to load and plot PRaVDA data in 2D histograms.
  • Wrote code to correlate tracker and calorimeter measurements, to produce a list of events with X, Y, E coordinates.
  • Wrote code to plot matched events into various 3D histograms: XY, XE, YE.
  • Progress report.
  • Progress interview.
  • Improved LeCroy & Caen matching by finding x-scale factor through chi-square minimisation.
  • All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs (187 plots).
  • Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
  • Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation or through peak event counting.
  • Convert energy to range in XYE histogram.
  • Plot 2D tracker histogram alongside 3D XYE histogram.
  • Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker.

Dates 2019

Date Event
07/02 - 08/02 PPRIG
11/02 - 12/02 UCL PhD Interviews
22/03 Final Report Deadline
03/06-07/06 MSci Presentation Week
Personal tools