ELogs/SaadShaikh: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
Line 30: Line 30:
* All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs (187 plots).
* All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs (187 plots).
* Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
* Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
* Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation.
* Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation and peak event counting.


== Dates 2019 ==
== Dates 2019 ==

Revision as of 16:10, 23 January 2019

Electronic Log for Saad Shaikh

To Do

High Priority

  • Plot 2D tracker histogram alongside 3D XYE histogram.
  • Produce poster for PPRIG of experiment with single-module calorimeter and PRaVDA tracker.

Low Priority

  • Investigate y-scale factor correction with chi-square minimisation.
  • Plot x-scale factors against y-scale factors divided by number of counts.
  • Re-attempt LeCroy scope dead-time measurements.
  • Start final report in February.

Completed

  • Literature review.
  • First Birmingham experimental run.
  • Wrote code to load and plot Caen digitiser data in histograms.
  • Overhauled LeCroy data analysis routines: (short region) double baseline sigma testing, dynamic integration window allocation, empty acquisition checks.
  • Wrote code to scale and plot LeCroy & Caen data onto single plot, using approximate x and y-scale factors.
  • Wrote code to load and plot PRaVDA data in 2D histograms.
  • Wrote code to correlate tracker and calorimeter measurements, to produce a list of events with X, Y, E coordinates.
  • Wrote code to plot matched events into various 3D histograms: XY, XE, YE.
  • Progress report.
  • Progress interview.
  • Improved LeCroy & Caen matching by finding x-scale factor through chi-square minimisation.
  • All runs from first Birmingham put through matching algorithm. Energy spectra, 2D tracker histograms, and 3D XY, XE & YE histograms plotted for all runs (187 plots).
  • Wrote code to plot 3D XY histograms, but with the height of bars being the average energy in the bin.
  • Improved LeCroy & Caen matching by finding y-scale factor through chi-square minimisation and peak event counting.

Dates 2019

Date Event
07/02 - 08/02 PPRIG
11/02 - 12/02 UCL PhD Interviews
22/03 Final Report Deadline
03/06-07/06 MSci Presentation Week