ELogs/SimonJolly: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
Line 6: Line 6:


* '''Recharge conference travel expenses.'''
* '''Recharge conference travel expenses.'''
* Modify FMC daughterboard design with ZMOD connector — '''Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren'''
* Modify FMC daughterboard design with ZMOD connector — '''Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren'''.
* Update DDC board design with improvements from '''Mark Jones (Oxford)''' and '''Duncan Parker (Imperial)'''. Clarify spec with '''Marko Levicnik'''.
* Update DDC board design with improvements from '''Mark Jones (Oxford)''' and '''Duncan Parker (Imperial)'''. Clarify spec with '''Marko Levicnik'''.
* Obtain
* Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
* Organise Monthly QA and December UCLH run.
* Update mechanical design of scintillator stack holder:
* Follow up email to Nuvia about 3mm sheets for Manchester FLASH and 2.8mm Clatterbridge.
** 3D print prototype using pillar supports.
* Arrange meeting with Linda Mortimer and Peter Corlett at Clatterbridge to discuss QA detector prototype (with Marjanca Feltrin and Saad Shaikh).
** Machined version from '''Harry Barnett''' once design fixed.
** Update design with 2 sensors.
* Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor:
** Design holder for NPL using same mounts as scintillator.
** Add holder for absorber plus machined absorber block for QA.
** '''Obtain pixel sensor specs from Tony Price (Birmingham)'''.
* Follow up scintillator machining:
** '''Martin Blackman''' (UCL Mechanical Workshop).
** '''Datron''' (via '''Harry Barnett''').
** Discuss results with Nuvia.
* Update Clatterbridge design and arrange experimental run.


=== HEP Group ===
=== HEP Group ===

Revision as of 11:40, 22 February 2024

Electronic Log for Simon Jolly

To Do

Research

  • Recharge conference travel expenses.
  • Modify FMC daughterboard design with ZMOD connector — Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren.
  • Update DDC board design with improvements from Mark Jones (Oxford) and Duncan Parker (Imperial). Clarify spec with Marko Levicnik.
  • Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
  • Update mechanical design of scintillator stack holder:
    • 3D print prototype using pillar supports.
    • Machined version from Harry Barnett once design fixed.
    • Update design with 2 sensors.
  • Organise experimental run at UCLH with NPL transmission calorimeter and Birmingham pixel sensor:
    • Design holder for NPL using same mounts as scintillator.
    • Add holder for absorber plus machined absorber block for QA.
    • Obtain pixel sensor specs from Tony Price (Birmingham).
  • Follow up scintillator machining:
    • Martin Blackman (UCL Mechanical Workshop).
    • Datron (via Harry Barnett).
    • Discuss results with Nuvia.
  • Update Clatterbridge design and arrange experimental run.

HEP Group

  • Update web pages with information for new users.
  • Add web design and editing pages to HEP group page.
  • Organise lab tools with Harry and Connor.
  • Obtain quote and write justification for Datron CNC.
  • Obtain quote and write justification for MarkForged 3D printer.
  • Set up group MacBook with JAMF again.

Documents To Review

  • FLASH paper

Teaching

Completed

Research

Teaching