Proton Calorimetry/Meetings/2018/02/28

From PBTWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Minutes for UCL Proton Calorimetry Meeting, 28th February 2018 (D17, Physics & Astronomy, UCL)

Present

Simon Jolly, Anastasia Basharina-Freshville, Matthieu Hentz, Jordan Silverman, Dan Walker, Laurent Kelleter

DW:

  • Took data with fast treatment plan verification prototype on 21st February.
  • Data received from Tony Price:
    • Spectra look messy with significant energy spread.
    • Can see difference between with and without polyethylene sheet.
  • Everything written up on Wiki: just need to add photos.
  • To Do:
    • Extract PRaVDA tracking data.
    • Email Tony Price and check exact energy and find out whether they have any energy spread data.
    • Correlate with scintillator pulses.
    • Create 3D dose distribution.

JS:

  • Working on building CAD models of Clatterbridge beamline.
  • Certain components are not specified correctly or overlap: SJ has provided most up-to-date drawings he has; MH will do the same.
  • To import models into Geant4:
    • Break each model down into constituent parts.
    • Create assembly of all components made of the same material.
    • Export this model as an STL-File (meshed CAD model).
    • Convert each material STL-File into GDML.
    • Import this meshed GDML file into Geant4 as given material.
  • To Do:
    • Finish CAD model for MH's simulation.
    • Define vacuum for initial vacuum tube.
    • Rerun simulations to check differences in simulations with CAD components.

LK:

  • Finished 3D printed cover for bridge over ISDI sensor bond wires.
  • To Do:
    • Install software on DAQ PC: DSLR software, EPIX card drivers and software, LabView, Aspect software (once we have it).
    • Test sensor.

ABF:

  • Scintillator sheets now polished: most of the scratches now removed.
  • To Do:
    • Install software on DAQ PC: Caen digitiser and HV.
    • Packing inventory.

MH:

  • Course deadlines are a week earlier than anticipated...
  • Geant4 Clatterbridge simulations finished.
  • To Do:
    • Update Wiki.
    • Submit coursework.