Proton Calorimetry/Meetings/2021/07/09: Difference between revisions

From PBTWiki
Jump to navigation Jump to search
Line 8: Line 8:
*ROOT installed on Pi and all analysis code is functional.
*ROOT installed on Pi and all analysis code is functional.
**Pi is slow – about 12Hz for replay with 2Hz with GUI fit, 8Hz without GUI.
**Pi is slow – about 12Hz for replay with 2Hz with GUI fit, 8Hz without GUI.
**Added instructions to detector equipment and ROOT pages on how to install libFTDI and ROOT on Pi.
*Abstract accepted for poster presentation at [https://nssmic.ieee.org/2021/ 2021 IEEE Nuclear Science Symposium and Medical Imaging Conference].
*Abstract accepted for poster presentation at [https://nssmic.ieee.org/2021/ 2021 IEEE Nuclear Science Symposium and Medical Imaging Conference].
**Will work with Raffy to produce poster.
**Will work with Raffy to produce poster.

Revision as of 16:18, 12 July 2021

Minutes for UCL Proton Calorimetry Meetings, 9th July

Present

Simon Jolly, Saad Shaikh, Fern Pannell

Saad Shaikh

  • ROOT installed on Pi and all analysis code is functional.
    • Pi is slow – about 12Hz for replay with 2Hz with GUI fit, 8Hz without GUI.
    • Added instructions to detector equipment and ROOT pages on how to install libFTDI and ROOT on Pi.
  • Abstract accepted for poster presentation at 2021 IEEE Nuclear Science Symposium and Medical Imaging Conference.
    • Will work with Raffy to produce poster.
  • Sheets 48, 23 and 53, 2 are significantly damaged from stripping paint.
  • Remaining 28 sheets in "optimal 32" will be finished painting with primer.
    • Will find additional 4 sheets from remaining pile to replace damaged sheets.

Fern Pannell