New Cooling Transition pipes and Capillaries - preliminary
The new cooling transition pipe layout has been modelled on all four quadrants of the +Z end and capillaries on one quadrant


T.J.FRASER 18th August 2003


photos of the 360 deg barrel end model at UCL

Imagine you are walking round PPB1 as photos are taken from this angle. (click for a larger view)


360 deg view of all four quadrants - note horizontal interlink indicated in red


top quadrant on 360 deg view (starting from lefthand horizontal interlink)
the 12 capillaries take the shortest route to join the exhaust pipes


close up of the first connector set
(6 connectors)


close up of the second connector set
(6 connectors)


next quadrant - on the right on the 360 view


close up of first connector set
(4 connectors)


close up of second connector set
(6 connectors)


next quadrant - at bottom on 360 view


first connector set
(6 connectors)


second connector set
(6 connectors


last quadrant - at left on 360 view


first connector set
(4 connectors)


second connector set
(6 connectors)


close up showing how transition pipe emerges from under LMTs