VIEWS OF THE ZEUS CTD WIRING and INSTALLATION - photos T.J.Fraser

1. A view inside the chamber after the first Superlayer had been 'strung'


2. A view inside the chamber with most wires installed


3. A view inside the fully strung chamber with one wire being replaced


4. Installation of the CTD at the heart of the ZEUS detector


5. The CTD sliding into position on rails


tjf@hep.ucl.ac.uk