ELogs/SimonJolly
< ELogs
Electronic Log for Simon Jolly
To Do
Research
- Modify FMC daughterboard design with ZMOD connector — Pete Hastings (Oxford)/Andy Rose (Imperial)/Matt Warren.
- Update DDC board design with improvements from Mark Jones (Oxford) and Duncan Parker (Imperial). Clarify spec with Marko Levicnik.
- Shrink board to accept 1.5mm sheet spacing for Clatterbridge.
- Update mechanical design of scintillator stack holder:
- Move to 4-sided readout.
- Potential for flex-rigid circuit design.
- Contact Nuvia to discuss nest stage of scintillator machining:
- Send on PowerPoint slides on scintillator blank requirements from Harry Barnett.
- Obtain blanks for Datron machining.
- Discuss potential of new injection moulds as per HB's requirements.
- Update Clatterbridge design and arrange experimental run.
Finance
- Apply for no-cost extension to CLASP grant: 10 months to 31st Jan 2027.
- Recharge excess costs from 559564 to 567928 and settle up travel.
Grant Opportunities
- UKRI Knowledge Transfer Partnership — no closing date.
- UKRI KTP Guidance Notes
- 12–36 months; £9million total budget.
- Innovate UK Knowledge Transfer Partnerships: 2025 to 2026 Round Three
- KTP 2025-2026 R3 Guidance
- Total fund: £9million; £8,500 per month costs; closing date: 17th September 2025 11:30.
- EPSRC Health Technologies Connectivity Awards: Round Two
- EPSRC Health Technologies Strategy
- Apply for funding to spend time in a different research or user environment to build new connections applicable to health technologies.
- Total fund: £4million; maximum award: £500,000; closing date: 2nd October 2025 16:00
Admin
HEP Group
- Update web pages with information for new users.
- Add web design and editing pages to HEP group page.
Documents To Review
- Stanford emails