== To-do List for QuADProBe v3 1st Beam Test (as of | == To-do List for QuADProBe v3 1st Beam Test (as of 11/2026) == | ||
=== Mechanical Design | === Mechanical Design === | ||
==== Scintillator Sheets ==== | |||
* Machine down v2 QuARC module sheets to 2.5mm (aim to be done by Friday 20/11) | |||
==== QuARC Module Enclosures ==== | |||
* All machined - first fit week of 23/11 and work out if any issues. | |||
==== Mounting and Racks ==== | |||
* Aim to do full test assembly in two weeks (two weeks from 11/11) | |||
* Week of 30/11 can be disassembled again and sent off for anodising by the first week of December. | |||
* Final aim to be reassembled with anodised parts before xmas break. | |||
==== SciFi Module ==== | |||
* Check mounting with S71285-128 boards - single board per array first.(setup for medaustron) | |||
* Check mechanical assembly with module and the mounting. | |||
=== FPGA DAQ === | === FPGA DAQ === | ||
==== Range Measurements with QuARC ==== | ==== Range Measurements with QuARC ==== | ||
==== Profile Measurements with SciFi==== | ==== Profile Measurements with SciFi ==== | ||
* Finish slides on S17285 pd array communication and signal requirements. | |||
=== Web GUI === | === Web GUI === | ||
* Live GUI to poll and display single frame json at 25 Hz effectively working for QuARC data. | |||
** Need to work on checking it can poll from data generated directly from Kria. | |||
* Functionality to 'arm' detector (i.e. checking the VBus, checking read back pattern from DDC232s and checking S17285 PD arrays are functioning correctly before acquiring data) | |||
* Additional GUI to monitor Kria parameters such as VBus etc | |||
* Functionality to toggle between raw and calibrated data | |||
* All functionality to display SciFi data. | |||
=== Beam Test Organisation and Logistics === | === Beam Test Organisation and Logistics === | ||
Latest revision as of 15:42, 11 November 2026
Personnel
- UCL: Simon Jolly (SJ), Joseph Bateman (JB), Febian (F), Matt Warren (MW), Harry Barnett (HB).
- Bari (Ba): Raffaella Radogna (RR).
- Oxford University (Ox): Pete Hastings (PH), Mark Jones (MJ).
- Imperial College (IC): Andy Rose (AR), Duncan Parker (DP), Munir Saleh (MS).
- Heidelberg (He): Blake Leverington (BL), Julian Horn (JH).
Design Goals
- Real-time measurements of PBT beam range with sub-millimetre precision using plastic scintillator range telescope.
- Real-time measurement of PBT beam spot size/position with sub-millimetre precision using scintillating fibre arrays.
- Coverage of “clinically relevant” transverse scanning area and range:
- 250 MeV/400 mm range.
- 5 cm × 5 cm scanning area.
- Integration into single portable detector enclosure with single power and network inputs and nozzle mount.
- Full system control and display with web-based GUI from on-board DAQ.
Current Status (October 2025)
- QuARC tested in Trento:
- Calibration stable.
- Range measurements repeatable.
- Full GUI control.
- Fibre array prototype tested in Trento:
- Analogue Hamamatsu photodiode arrays and driver circuits.
- NI-driven DAQ.
- Fibre arrays assembled in Italy with 500 micron scintillating fibres.
- Repeatable, low noise measurements of beam position and profile at multiple positions and sizes.
QuARC Development
- Reduce scintillator sheet thickness/photodiode spacing to 2.5 mm.
- Improve manufacturing process and surface finish.
- Move from 2 to 4-sided photodiode readout.
- Replace individual photodiodes with 16-element arrays.
- Daisy-chain electronics around 4 sides of single module.
- Increase scintillator area to 150 × 150 mm.
Scintillator Development
- Existing scintillator sheets need machining on Datron to improve quality and reduce thickness to 2.5 mm: HB.
- Superior quality scintillator blanks needed from Nuvia: HB and SJ to liaise with Hana Buresova.
- Move to larger area scintillator sheets once 100 mm sheet production refined.
Scintillator Modules
- Redesign scintillator stack holders for 4-sided readout: HB.
- Individual modules must be self-contained and pre-cabled on 3 sides with only top-mounted USB-C I/O connector needing to be connected when assembling.
Photodiodes and Electronics
- Front-end DDC boards need to shrink to accommodate Hamamatsu S12362 16-element arrays with 2.5 mm pitch: PH.
- Replace vertical USB-C connectors with horizontal and move to upstream end to match new 4-sided setup: PH to liaise with HB.
DAQ and GUI
- Streamline existing FPGA code to improve memory management: MW.
- Replace Raspberry Pi/USB104 with QuADProBe Kria (see below): F.
- Live GUI frequently unresponsive, needs resolving: JB.
- Replace PapaParse with direct JSON input: JB.
- Ensure post processing and replay fully functional to review previous beam tests: JB.
QuADProBe Development
- 250 micron square scintillating fibre arrays: RR.
- Hamamatsu digital S17285 photodiode array readout.
- Kria-based DAQ.
Front-End Electronics
- Move to Hamamatsu S17285 arrays.
- Mechanical design of holder for scintillating fibres and photodiode arrays: HB.
- Interface board needed for power/timing signal distribution and board I/O: PH.
DAQ
- Transition from Pi/USB104 to Kria.
- Kria needs bespoke carrier board for power and DAQ interconnects: IC.
- Port existing Pi DAQ code to Kria: F.
- Expand firmware to include SciFi readout and 4-sided QuARC: F.
- Modify GUI to include spot position measurements: JB.
Reconstruction
- Development “Event Tagging” system to sync SciFi and QuARC “Events”: JB.
- Streamline reconstruction process to allow rapid reconstruction of acquired data: JB.
Mechanical Design (HB)
- Enlarge cover/alignment plates and resolve offset.
- Investigate use of carbon fibre sheet to replace aluminised mylar windows.
- Modify rails with better mounts for module fixation.
- Nozzle mount.
Calibration and data
- Is it possible to calibrate the detector without a proton beam?
- Maybe an e- beam beta source?
To-do List for QuADProBe v3 1st Beam Test (as of 11/2026)
Mechanical Design
Scintillator Sheets
- Machine down v2 QuARC module sheets to 2.5mm (aim to be done by Friday 20/11)
QuARC Module Enclosures
- All machined - first fit week of 23/11 and work out if any issues.
Mounting and Racks
- Aim to do full test assembly in two weeks (two weeks from 11/11)
- Week of 30/11 can be disassembled again and sent off for anodising by the first week of December.
- Final aim to be reassembled with anodised parts before xmas break.
SciFi Module
- Check mounting with S71285-128 boards - single board per array first.(setup for medaustron)
- Check mechanical assembly with module and the mounting.
FPGA DAQ
Range Measurements with QuARC
Profile Measurements with SciFi
- Finish slides on S17285 pd array communication and signal requirements.
Web GUI
- Live GUI to poll and display single frame json at 25 Hz effectively working for QuARC data.
- Need to work on checking it can poll from data generated directly from Kria.
- Functionality to 'arm' detector (i.e. checking the VBus, checking read back pattern from DDC232s and checking S17285 PD arrays are functioning correctly before acquiring data)
- Additional GUI to monitor Kria parameters such as VBus etc
- Functionality to toggle between raw and calibrated data
- All functionality to display SciFi data.
Beam Test Organisation and Logistics
Future Beam Tests
- Compare QuADProBe performance against HIT scintillating fibre array: SJ to liaise with JH.
- Retest alignment of Czech PTC nozzle and QA: SJ to liaise with Prague PTC.
- Collate list of centres that can provide scanned fields/treatment plans from experimental nozzles: SJ.
- Nozzle-mounted test with Mevion system at Maastro.