2025/08/05: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
== Minutes for UCL Proton Beam Therapy Group Meetings, | == Minutes for UCL Proton Beam Therapy Group Meetings, 5th August == | ||
=== Present === | === Present === |
Revision as of 09:04, 6 October 2025
Minutes for UCL Proton Beam Therapy Group Meetings, 5th August
Present
Joe Bateman, Sonia Escribano, Febian, Simon Jolly
Simon Jolly
- Ordered two starter kits for kria
- Potentially do FLASH calibration of module 2 in addition to conv calibration of all 3 at Trento
Sonia Escribano
- Tested revF boards - 4 of the 8 working boards - fully working (other 4 full of soldering residue so can’t connect PDs)
- 4 working boards now assembled within 3-module QuARC and working
- Sorted cables for Trento beam test and spares
- Will need to do shoot throughs of first two modules since have new boards - no changes to module 3 but will have another shoot through
- One zmod board not working
- Two of the fpga’s only work with 5V
- For beam shift QuARC measurements do difference over sum for position measurements
- Run 66 overwritten with background data