ELogs/DanialSaeed: Difference between revisions
< ELogs
DanialSaeed (talk | contribs) (→To Do) |
DanialSaeed (talk | contribs) (→To Do) |
||
| Line 3: | Line 3: | ||
== To Do == | == To Do == | ||
'''feedback meeting with supervisor required within 3 weeks of submission.''' | '''feedback meeting with supervisor required within 3 weeks of submission.''' | ||
Presentation Corrections to be made and presentation to be uploaded. | |||
Further work on Code: | |||
* ensure files are generated at 25Hz continually while files are being accessed by .Js code. | |||
== Completed == | == Completed == | ||
Revision as of 12:45, 19 November 2025
Electronic log for Danial Saeed
To Do
feedback meeting with supervisor required within 3 weeks of submission.
Presentation Corrections to be made and presentation to be uploaded.
Further work on Code:
- ensure files are generated at 25Hz continually while files are being accessed by .Js code.
Completed
Reply Project Name to Module Lead
- Following project name was given : JOLLYPBTGUI - Developing a Graphical User Interface for a Proton Beam Therapy Detector
- (also begun literature reading) struggling to confirm wether papers are relevant directly. learning about press ion of the field.
- wrote code that writes and saves a JSON
- made script which displays bar chart via python to understand timing responsibilities when applying to D3