Electronic Log for Mechanical Engineering
To Do
- Scintillator stack holder redesign
- Scintillator machining
- Peli case scintillator module holder frame
- SciFi frame and holder
- Kria and carrier board installation in Peli 1510 case
- Alignment frame
- Cover/Alignment plates and markings
- Nozzle mount
Items 1–5 to be completed by end of May
Items 1–5 to be completed by 18th September
Redesigned scintillator stack holders
- Moving from 2-sided to 4-sided readout
- Sheet thickness reduced from 3mm to 2.5mm
- Updating photodiodes from S12915-16R single element photodiodes to S12362-021 16-element arrays.
- New DDC boards are H-shaped to accommodate updated USB-C cable routing and 4-sided photodiode arrays.
- Redesigned stack holders need to accommodate thinner scintillator sheets — and therefore a reduction in stack thickness from ≥96mm to ≥80mm — with identical transverse dimensions of 100mm x 100mm.
- Mounting plate needed to interface with new Peli case support frame.
Scintillator machining
- Scintillator thickness needs to be reduced from 3mm to 2.5mm to accommodate photodiode spacing in new arrays.
- Injection moulded sheets do not have parallel large faces.
- Lower quality “opaque” sheets need surface finishing improved.
- Machine all sheets down to 2.5mm for new stacks.
- At least 128 sheets needed for 4×32-sheet modules.
Peli case scintillator module holder frame
- Change QuARC module and SciFi mounting system in Peli case to make modules easier to install and remove.
- Raise support rails from the base of the Peli case to approximately level with the lid hinges.
- Keep shock absorber mounts in base to retain vibration isolation.
- Include mounts for new Kria box: mount under rails but with USB-C connectors visible.
- Include mount points for nozzle mount.
- Rigid mechanical structure needed with fixed mount points for travel plus adjustable fixation for calibration test removal.
SciFi frame and holder
- X and Y scintillating fibre arrays already mounted into frame.
- New mounting plate needed to match new support rails.
- Front-end interface boards for new Hamamatsu S17285 photodiode arrays coming from Pete Hastings (Oxford): will need mounting on top of S17285.
Kria and carrier board installation in Peli 1510 case
- Kria carrier board designed around specific case.
- Case needs mount points underneath scintillator module rails.
- Ensure USB-C sockets are accessible outside rails.
Alignment frame
- Previous beam measurements have indicated misalignment between cover plate markings and in-room lasers.
- Frame needed to sit outside Peli case that aligns with cover plate markings.
- Frame should be placed over Peli case to check alignment markings.
- Frame should be free-standing to sit on couch to check alignment.
Cover/Alignment plates and markings
- Cover plates need enlarging to cover larger entry/exit windows.
- Make cover plates out of thinner material so that they don't have to be removed.
- Add precision marking to box lid to ease in-room alignment.
Nozzle mount for detector enclosure
- Small Peli case needs to be nozzle-mounted for beam tests.
- SJ in contact with Prague/IBA for mounting points for Prague-IBA nozzle.
- Dimensions already obtained from UCLH measurements:
- SJ has contacted UCLH to check whether we can bypass light curtain.
- Assume we can't and design to bypass mechanically...
- 3 parts needed:
- Nozzle mounting plate that sits inside nozzle using range modulator plate mounting slots.
- U-bracket that slots in to this mounting plate — bypassing the light curtain — with a 40 x 30 cm hole for the beam to pass through.