Proton Calorimetry/Future Work
Jump to navigation
Jump to search
Personnel
- UCL: Simon Jolly (SJ), Joseph Bateman (JB), Febian (F), Matt Warren (MW), Harry Barnett (HB).
- Bari (Ba): Raffaella Radogna (RR).
- Oxford University (Ox): Pete Hastings (PH), Mark Jones (MJ).
- Imperial College (IC): Andy Rose (AR), Duncan Parker (DP), Munir Saleh (MS).
- Heidelberg (He): Blake Leverington (BL), Julian Horn (JH).
Design Goals
- Real-time measurements of PBT beam range with sub-millimetre precision using plastic scintillator range telescope.
- Real-time measurement of PBT beam spot size/position with sub-millimetre precision using scintillating fibre arrays.
- Coverage of “clinically relevant” transverse scanning area and range:
- 250 MeV/400 mm range.
- 5 cm × 5 cm scanning area.
- Integration into single portable detector enclosure with single power and network inputs and nozzle mount.
- Full system control and display with web-based GUI from on-board DAQ.
Current Status (October 2025)
- QuARC tested in Trento:
- Calibration stable.
- Range measurements repeatable.
- Full GUI control.
- Fibre array prototype tested in Trento:
- Analogue Hamamatsu photodiode arrays and driver circuits.
- NI-driven DAQ.
- Fibre arrays assembled in Italy with 500 micron scintillating fibres.
- Repeatable, low noise measurements of beam position and profile at multiple positions and sizes.
QuARC Development
- Reduce scintillator sheet thickness/photodiode spacing to 2.5 mm.
- Improve manufacturing process and surface finish.
- Move from 2 to 4-sided photodiode readout.
- Replace individual photodiodes with 16-element arrays.
- Daisy-chain electronics around 4 sides of single module.
- Increase scintillator area to 150 × 150 mm.
Scintillator Development
- Existing scintillator sheets need machining on Datron to improve quality and reduce thickness to 2.5 mm: HB.
- Superior quality scintillator blanks needed from Nuvia: HB and SJ to liaise with Hana Buresova.
- Move to larger area scintillator sheets once 100 mm sheet production refined.
Scintillator Modules
- Redesign scintillator stack holders for 4-sided readout: HB.
- Individual modules must be self-contained and pre-cabled on 3 sides with only top-mounted USB-C I/O connector needing to be connected when assembling.
Photodiodes and Electronics
- Front-end DDC boards need to shrink to accommodate Hamamatsu S12362 16-element arrays with 2.5 mm pitch: PH.
- Replace vertical USB-C connectors with horizontal and move to upstream end to match new 4-sided setup: PH to liaise with HB.
DAQ and GUI
- Streamline existing FPGA code to improve memory management: MW.
- Replace Raspberry Pi/USB104 with QuADProBe Kria (see below): F.
- Live GUI frequently unresponsive, needs resolving: JB.
- Replace PapaParse with direct JSON input: JB.
- Ensure post processing and replay fully functional to review previous beam tests: JB.
QuADProBe Development
- 250 micron square scintillating fibre arrays: RR.
- Hamamatsu digital S17285 photodiode array readout.
- Kria-based DAQ.
Front-End Electronics
- Move to Hamamatsu S17285 arrays.
- Mechanical design of holder for scintillating fibres and photodiode arrays: HB.
- Interface board needed for power/timing signal distribution and board I/O: PH.
DAQ
- Transition from Pi/USB104 to Kria.
- Kria needs bespoke carrier board for power and DAQ interconnects: IC.
- Port existing Pi DAQ code to Kria: F.
- Expand firmware to include SciFi readout and 4-sided QuARC: F.
- Modify GUI to include spot position measurements: JB.
Reconstruction
- Development “Event Tagging” system to sync SciFi and QuARC “Events”: JB.
- Streamline reconstruction process to allow rapid reconstruction of acquired data: JB.
Mechanical Design (HB)
- Enlarge cover/alignment plates and resolve offset.
- Investigate use of carbon fibre sheet to replace aluminised mylar windows.
- Modify rails with better mounts for module fixation.
- Nozzle mount.
Calibration and data
- Is it possible to calibrate the detector without a proton beam?
- Maybe an e- beam beta source?
Future Beam Tests
- Compare QuADProBe performance against HIT scintillating fibre array: SJ to liaise with JH.
- Retest alignment of Czech PTC nozzle and QA: SJ to liaise with Prague PTC.
- Collate list of centres that can provide scanned fields/treatment plans from experimental nozzles: SJ.
- Nozzle-mounted test with Merino system at Maastro.