Difference: T2UKMeetings2006-06-14 (7 vs. 8)

Revision 82006-06-14 - ThorstenWengler

Line: 1 to 1
 
META TOPICPARENT name="T2UKMeetings"

Agenda

Line: 17 to 17
 
      • Update on network implementation - Network monitoring and control - Remote farm work
    • WP3: PESA software 15h00 (120min)
      • Core sw (45min)
Changed:
<
<
        • Configuration - Steering - Region Selector - Persistency
>
>
 
        • Releases - Automated tests
      • L2 tracking (45min)
Line: 40 to 41
 
META FILEATTACHMENT attr="" comment="" date="1150217285" name="Tracking.ppt" path="E:\T2UKmanc140606\Tracking.ppt" size="315392" user="JohnBaines" version="1.1"
META FILEATTACHMENT attr="" comment="" date="1150240349" name="nonitor-hist.ppt" path="C:\Documents and Settings\nikos\Desktop\nonitor-hist.ppt" size="28672" user="NikosKonstantinidis" version="1.1"
META FILEATTACHMENT attr="" comment="zFinder tuning/alternatives" date="1150291236" name="zFinder_report.ppt" path="zFinder_report.ppt" size="278528" user="ErkcanOzcan" version="1.2"
Added:
>
>
META FILEATTACHMENT attr="" comment="" date="1150297737" name="t2uk-14June06.ppt" path="t2uk-14June06.ppt" size="1232896" user="ThorstenWengler" version="1.1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback