 |
 |
 |
 |
 |
 |
 |
 |
 |
• |
Strategy
is to look for NC - like events at peaks at High
|
|
mass
related by M = Öxs, and x,
with high Q2
|
|
|
• |
Cuts
to maintain High Efficiency
|
|
|
• |
ET,e > 15GeV, Q2 > 2500, 40 <=SUM(E-Pz)>=70GeV
|
|
|
|
|
• |
Use
of the Zeus Monte Carlo Programs, and Funnelling
|
|
methods
to reconstruct the detector
|
|
|
• |
1997 Data Sample Use 13.8pb-1 gathered so far
|
|
|
|
|
• |
Both
run through same frame work
|
|