Test (LH) harness connector box in P2 position
LMTs off barrel end stored in LMT box.
Note FSI fibres going into fibre box between P3 and P4.
Note there is a gap of a few mms between fibre box and LMT box.
LMT loop on bench as removed from LMT box
LMT loop - note LMTs start in a mid height position (on the right)
as they enter the box from the height of the ring
flange of the services cage.
whole barrel 3 with services cages either end
Close-up of cooling transition pipe box
FSI fibre storage spool - these will have to go next to R/O fibres(?)
FSI fibre and DCS wires exit from the barrel
into a fibre storage box. Note DCS wires will not
actually go in the same box