Harness installation trials on Barrel 3 at RAL
Services cage box order/FSI fibre storage/LMT harness storage


photos J.Fraser 1st October 2003


photos of preliminary installation of Services Cage Boxes, a first trial installing a test harness and what to do with FSI fibres
(click for a larger view)


Test (LH) harness connector box in P2 position


LMTs off barrel end stored in LMT box.
Note FSI fibres going into fibre box between P3 and P4.
Note there is a gap of a few mms between fibre box and LMT box.


LMT loop on bench as removed from LMT box


LMT loop - note LMTs start in a mid height position (on the right)
as they enter the box from the height of the ring
flange of the services cage.


whole barrel 3 with services cages either end


+Z end


+Z end (boxes in old order)


Close-up of cooling transition pipe box


DCS wire boxes


FSI fibre storage spool - these will have to go next to R/O fibres(?)


FSI fibre and DCS wires exit from the barrel
into a fibre storage box. Note DCS wires will not
actually go in the same box