CHANGLOG for the Stave250 branch of the HSIO build [* = known bad, don't use] [+ = possibly bad, use with caution] [ = could also be bad - let me know ;-)] 18/02/13 (420c) FX100 48TH8IH 18/02/13 (420b) FX100 48TH 18/02/13 (420a) Move to ISE14.7, FX100 build 31/10/13 (4209) 48T - all sigs re-added (back to normal) re-instated stream debug lines on lemos 5-7 25/10/13 (4208) 16TH16BH - debug and 1-wire and NOISE set to zero 25/10/13 (4207) 16TH16BH - debug and 1-wire set to zero 24/10/13 (4206) 16TH16BH - debug connections set to zero (P2-5, LEMO1-8) 23/10/13 (4205) 16TH16BH - have fun Sergio 11/10/13 (4202) 24T with fast test outputs ... 11/10/13 (4200) 24T first build of Stave250 branch