Here are some new photographs of the new lab at MSSL. The three panoramic shots are very good.
MSSL_March07 1
MSSL_March07 2
MSSL_March07 3
MSSL_March07 4
MSSL_March07 5
MSSL_March07 6
MSSL_March07 7(panoramic)
MSSL_March07 8(panoramic)
MSSL_March07 9(panoramic)

Here are some old photographs of the new lab at MSSL and architectural drawings.
MSSL_Dec_06 1
MSSL_Dec_06 2
MSSL_Dec_06 3
MSSL_Dec_06 4
MSSL_Dec_06 5
MSSL_Dec_06 6
MSSL drawing 1 pdf
MSSL drawing 2 pdf

New photographs of C0 production at MSSL
Wrapped C_section
xwall modules in row on bench
Bobby installing C0
xwall C0 installation rearView
seal on xwall OM
seal on veto OM
Derek installing C0
view of nulab
loading bay door nulab
crane Rob pointing at gas supply nulab