ELogs/SimonJolly: Difference between revisions
< ELogs
SimonJolly (talk | contribs) |
SimonJolly (talk | contribs) (→Admin) |
||
(14 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
== To Do == | == To Do == | ||
PBT group eLog pages: | |||
* [[ELogs/JoeBateman|Joe Bateman]] | |||
* [[ELogs/SoniaEscribano|Sonia Escribano Rodriguez]] | |||
* [[ELogs/Febian|Febian]] | |||
* [[ELogs/Electronics|Electronics]] | |||
* [[ELogs/MechanicalEngineering|Mech Eng]] | |||
=== Research === | === Research === | ||
* ''' | * '''QuARC''' improvements: | ||
* | *# Updates to Peli case enclosure from '''Harry Barnett''': see [[ELogs/MechanicalEngineering#To_Do|Mech Eng eLog]]. | ||
* | *# Power distribution board, 2.5mm photodiode array readout and 1.5mm photodiode array Clatterbridge module from '''Pete Hastings (Oxford)''': see [[ELogs/Electronics#Oxford]]. | ||
* | *# Optimise speed of web GUI: replace PapaParse with direct XHR? | ||
* Front-end electronics for '''QuADProBe''' SciFi: | |||
** Design underway from '''Andy Rose (Imperial)''': see [[ELogs/Electronics#Imperial]]. | |||
** Confirm first-stage iteration and design. | |||
** Purchase and set up Kria plus starter kits. | |||
* Update mechanical design of scintillator stack holder: | * Update mechanical design of scintillator stack holder: | ||
** | ** Move to 4-sided readout. | ||
** | ** Use BPM-like reconstruction for QuARC position measurement. | ||
** | ** Potential for flex-rigid circuit design. | ||
* | |||
** | * Contact '''Nuvia''' to discuss nest stage of scintillator machining: | ||
** | ** Send on PowerPoint slides on scintillator blank requirements from '''Harry Barnett'''. | ||
** ''' | ** Obtain blanks for Datron machining. | ||
* | ** Discuss potential of new injection moulds as per '''HB's''' requirements. | ||
* | |||
** ''' | === Finance === | ||
* | |||
* | * Book travel for Trento for Joe and Sonia: | ||
** Arrive Sunday 28th September | |||
** Depart Thursday 2nd October | |||
** Stay NH Hotel Trento | |||
* '''Apply for no-cost extension to CLASP grant:''' 10 months to 31st Jan 2027. | |||
* Recharge excess costs from '''559564''' to '''567928''' and settle up travel. | |||
* Investigate innovation collaboration with '''Elekta''' and '''CI''': follow up with '''Stewart Boogert'''. | |||
=== Grant Opportunities === | |||
[https://liveuclac.sharepoint.com/sites/PhysAstStaffIntranet/SitePages/Funding-Calls.aspx UCL Physics Intranet Funding Calls] | |||
[https://www.ucl.ac.uk/mathematical-physical-sciences/research/research-funding-and-support UCL MAPS Faculty Research Funding and Support] | |||
[https://www.ukri.org/opportunity/ UKRI Funding Finder] | |||
[https://www.ucl.ac.uk/research-innovation-services/planning-insight-and-improvement/internally-managed-calls UCL Internally Managed Calls] | |||
* [https://www.ukri.org/opportunity/knowledge-transfer-partnership/ UKRI Knowledge Transfer Partnership] — no closing date. | |||
** [https://www.ukri.org/councils/innovate-uk/guidance-for-applicants/guidance-for-specific-funds/knowledge-transfer-partnership-guidance/ UKRI KTP Guidance Notes] | |||
** 12–36 months; £9million total budget. | |||
* [https://www.ukri.org/opportunity/knowledge-transfer-partnership-2025-to-2026-round-three/ Innovate UK Knowledge Transfer Partnerships: 2025 to 2026 Round Three] | |||
** [https://apply-for-innovation-funding.service.gov.uk/competition/2184/overview/c599b17c-e13a-4e13-995e-53cc4d4508a1 KTP 2025-2026 R3 Guidance] | |||
** Total fund: £9million; £8,500 per month costs; closing date: '''17th September 2025 11:30'''. | |||
* [https://www.ukri.org/opportunity/health-technologies-connectivity-awards-round-two/ EPSRC Health Technologies Connectivity Awards: Round Two] | |||
** Apply for funding to spend time in a different research or user environment to build new connections applicable to health technologies. | |||
** [https://www.ukri.org/publications/epsrc-health-technologies-strategy/epsrc-health-technologies-strategy/ EPSRC Health Technologies Strategy] | |||
** [https://www.ukri.org/what-we-do/browse-our-areas-of-investment-and-support/healthcare-technologies-theme/ EPSRC Healthcare Technologies Theme] | |||
** Total fund: £4million; maximum award: £500,000; closing date: '''2nd October 2025 16:00''' | |||
=== Admin === | |||
* Chase up IoP membership. | |||
* Apply for [https://liveuclac.sharepoint.com/sites/ODLearningandLeadershipDevelopmentHub UCL Leadership Programme]: deadline '''8th September 2025'''. | |||
* Complete appraisal for '''Joe Bateman'''. | |||
=== HEP Group === | === HEP Group === | ||
Line 27: | Line 76: | ||
* Update web pages with information for new users. | * Update web pages with information for new users. | ||
* Add web design and editing pages to HEP group page. | * Add web design and editing pages to HEP group page. | ||
=== Documents To Review === | === Documents To Review === | ||
* | * Stanford emails | ||
=== Teaching === | === Teaching === | ||
<!-- | |||
== Completed == | == Completed == | ||
Line 43: | Line 89: | ||
=== Teaching === | === Teaching === | ||
--> |
Latest revision as of 16:39, 11 August 2025
Electronic Log for Simon Jolly
To Do
PBT group eLog pages:
Research
- QuARC improvements:
- Updates to Peli case enclosure from Harry Barnett: see Mech Eng eLog.
- Power distribution board, 2.5mm photodiode array readout and 1.5mm photodiode array Clatterbridge module from Pete Hastings (Oxford): see ELogs/Electronics#Oxford.
- Optimise speed of web GUI: replace PapaParse with direct XHR?
- Front-end electronics for QuADProBe SciFi:
- Design underway from Andy Rose (Imperial): see ELogs/Electronics#Imperial.
- Confirm first-stage iteration and design.
- Purchase and set up Kria plus starter kits.
- Update mechanical design of scintillator stack holder:
- Move to 4-sided readout.
- Use BPM-like reconstruction for QuARC position measurement.
- Potential for flex-rigid circuit design.
- Contact Nuvia to discuss nest stage of scintillator machining:
- Send on PowerPoint slides on scintillator blank requirements from Harry Barnett.
- Obtain blanks for Datron machining.
- Discuss potential of new injection moulds as per HB's requirements.
Finance
- Book travel for Trento for Joe and Sonia:
- Arrive Sunday 28th September
- Depart Thursday 2nd October
- Stay NH Hotel Trento
- Apply for no-cost extension to CLASP grant: 10 months to 31st Jan 2027.
- Recharge excess costs from 559564 to 567928 and settle up travel.
- Investigate innovation collaboration with Elekta and CI: follow up with Stewart Boogert.
Grant Opportunities
UCL Physics Intranet Funding Calls
UCL MAPS Faculty Research Funding and Support
- UKRI Knowledge Transfer Partnership — no closing date.
- UKRI KTP Guidance Notes
- 12–36 months; £9million total budget.
- Innovate UK Knowledge Transfer Partnerships: 2025 to 2026 Round Three
- KTP 2025-2026 R3 Guidance
- Total fund: £9million; £8,500 per month costs; closing date: 17th September 2025 11:30.
- EPSRC Health Technologies Connectivity Awards: Round Two
- Apply for funding to spend time in a different research or user environment to build new connections applicable to health technologies.
- EPSRC Health Technologies Strategy
- EPSRC Healthcare Technologies Theme
- Total fund: £4million; maximum award: £500,000; closing date: 2nd October 2025 16:00
Admin
- Chase up IoP membership.
- Apply for UCL Leadership Programme: deadline 8th September 2025.
- Complete appraisal for Joe Bateman.
HEP Group
- Update web pages with information for new users.
- Add web design and editing pages to HEP group page.
Documents To Review
- Stanford emails