| Line 36: | Line 36: | ||
| # Set up mains cabling and networking in treatment and control rooms. | # Set up mains cabling and networking in treatment and control rooms. | ||
| ## no beam | |||
| # Install Peli case on treatment couch. | # Install Peli case on treatment couch. | ||
| # Calibration shoot-through measurements of 4  | ## no beam | ||
| # Background | |||
| ## no beam | |||
| # Calibration shoot-through measurements of 4 stack modules: either rotating case or modules for back shoot-through. | |||
| ## 8 beam deliveries (2 beam deliveries (back and forth) per each module): | |||
| {| class="wikitable" | |||
| !Run number | |||
| !Detector config | |||
| !Beam Energy (MeV) | |||
| !Beam Current (nA) | |||
| !Physical thickness (mm) | |||
| !D80 measured (mm) | |||
| !WET (mm) | |||
| !RSP | |||
| !Comments | |||
| |- | |||
| |33 || Stack 1 front || 245 || 18.8 (18.7) || 95.95 || 198.69 || 98.24 || 1.024 || | |||
| |- | |||
| |34 || Stack 1 back || 245 || 18.8 (18.7) || 95.95 || 198.74 ||  98.19 || 1.023 || | |||
| |- | |||
| |36 || Stack 2 front || 245 || 18.8 (18.7) || 96.81 || 198.51 ||  98.42 ||  1.016 || | |||
| |- | |||
| |37 || Stack 3 front || 245 || 18.8 (18.7) || 95.48 || 199.78 ||  97.15 ||  1.017 || | |||
| |- | |||
| |40 || Stack 4 front || 245 || 18.8 (18.7) || 94.07 || 202.26 || 94.67 || 1.006 || | |||
| |- | |||
| |41 || Empty Box || 245 || 18.8 (18.7) || 0.012 || 296.93 || 0 || 0 || | |||
| |- | |||
| |42 || No Box || 245 || 18.8 (18.7) || 0 || 296.90 || 0 || 0 || | |||
| |} | |||
| # Pristine Bragg peak measurements at clinical current for full clinical range. | # Pristine Bragg peak measurements at clinical current for full clinical range. | ||
| # FLASH measurements at 245 MeV. | # FLASH measurements at 245 MeV. | ||
Revision as of 10:20, 4 February 2025
Experiment Equipment
| Item | Notes | 
|---|---|
| Network Hub | Set in control room to take output from experimental room ethernet connection. Control laptops connected via 5GHz WiFi. | 
| Control Laptop x2 | 1 for remote control of FPGA, 1 for notes/web GUI. | 
| Ethernet Cable x 2 | To connect DAQ laptop to network in the experimental room, control laptop to network in control room. | 
| Portable Enclosure | |
| Scintillator stacks | 4 Modules (to cover the full clinical range, from 60 to 250 MeV) | 
| Scintillating fibers module | 1 2D Module | 
| DAQ laptop x1 | Control photodiode acquisition. | 
| Nexys Video FPGA development board. | For interfacing between DDC232 and PC. | 
Schematic
Experiment Plan
- Set up mains cabling and networking in treatment and control rooms.
- no beam
 
- Install Peli case on treatment couch.
- no beam
 
- Background
- no beam
 
- Calibration shoot-through measurements of 4 stack modules: either rotating case or modules for back shoot-through.
- 8 beam deliveries (2 beam deliveries (back and forth) per each module):
 
| Run number | Detector config | Beam Energy (MeV) | Beam Current (nA) | Physical thickness (mm) | D80 measured (mm) | WET (mm) | RSP | Comments | 
|---|---|---|---|---|---|---|---|---|
| 33 | Stack 1 front | 245 | 18.8 (18.7) | 95.95 | 198.69 | 98.24 | 1.024 | |
| 34 | Stack 1 back | 245 | 18.8 (18.7) | 95.95 | 198.74 | 98.19 | 1.023 | |
| 36 | Stack 2 front | 245 | 18.8 (18.7) | 96.81 | 198.51 | 98.42 | 1.016 | |
| 37 | Stack 3 front | 245 | 18.8 (18.7) | 95.48 | 199.78 | 97.15 | 1.017 | |
| 40 | Stack 4 front | 245 | 18.8 (18.7) | 94.07 | 202.26 | 94.67 | 1.006 | |
| 41 | Empty Box | 245 | 18.8 (18.7) | 0.012 | 296.93 | 0 | 0 | |
| 42 | No Box | 245 | 18.8 (18.7) | 0 | 296.90 | 0 | 0 | 
- Pristine Bragg peak measurements at clinical current for full clinical range.
- FLASH measurements at 245 MeV.