*# Optimise speed of web GUI: replace PapaParse with direct XHR? | *# Optimise speed of web GUI: replace PapaParse with direct XHR? | ||
* Front-end electronics for QuADProBe SciFi: | * Front-end electronics for '''QuADProBe''' SciFi: | ||
** Confirm | ** Design underway from '''Andy Rose (Imperial)''': see [[ELogs/Electronics#Imperial]]. | ||
** Confirm first-stage iteration and design. | |||
** Purchase and set up Kria plus starter kits. | |||
* Update mechanical design of scintillator stack holder: | * Update mechanical design of scintillator stack holder: | ||
** Move to 4-sided readout. | ** Move to 4-sided readout. |
Revision as of 16:07, 11 August 2025
Electronic Log for Simon Jolly
To Do
PBT group eLog pages:
Research
- QuARC improvements:
- Updates to Peli case enclosure from Harry Barnett: see Mech Eng eLog.
- Power distribution board, 2.5mm photodiode array readout and 1.5mm photodiode array Clatterbridge module from Pete Hastings (Oxford): see ELogs/Electronics#Oxford.
- Optimise speed of web GUI: replace PapaParse with direct XHR?
- Front-end electronics for QuADProBe SciFi:
- Design underway from Andy Rose (Imperial): see ELogs/Electronics#Imperial.
- Confirm first-stage iteration and design.
- Purchase and set up Kria plus starter kits.
- Update mechanical design of scintillator stack holder:
- Move to 4-sided readout.
- Use BPM-like reconstruction for QuARC position measurement.
- Potential for flex-rigid circuit design.
- Contact Nuvia to discuss nest stage of scintillator machining:
- Send on PowerPoint slides on scintillator blank requirements from Harry Barnett.
- Obtain blanks for Datron machining.
- Discuss potential of new injection moulds as per HB's requirements.
Finance
- Apply for no-cost extension to CLASP grant: 10 months to 31st Jan 2027.
- Recharge excess costs from 559564 to 567928 and settle up travel.
- Investigate innovation collaboration with Elekta and CI: follow up with Stewart Boogert.
Grant Opportunities
UCL Physics Intranet Funding Calls
UCL MAPS Faculty Research Funding and Support
- UKRI Knowledge Transfer Partnership — no closing date.
- UKRI KTP Guidance Notes
- 12–36 months; £9million total budget.
- Innovate UK Knowledge Transfer Partnerships: 2025 to 2026 Round Three
- KTP 2025-2026 R3 Guidance
- Total fund: £9million; £8,500 per month costs; closing date: 17th September 2025 11:30.
- EPSRC Health Technologies Connectivity Awards: Round Two
- Apply for funding to spend time in a different research or user environment to build new connections applicable to health technologies.
- EPSRC Health Technologies Strategy
- EPSRC Healthcare Technologies Theme
- Total fund: £4million; maximum award: £500,000; closing date: 2nd October 2025 16:00
Admin
- Chase up IoP membership.
- Apply for UCL Leadership Programme
- Complete appraisal for Joe Bateman.
- Complete leavers form for Sonia Escribano.
HEP Group
- Update web pages with information for new users.
- Add web design and editing pages to HEP group page.
Documents To Review