|
META TOPICPARENT |
name="T2UKMeetings" |
The meeting will be at RAL in Conference Room 13, starting at 13h00. |
|
- Minutes of last meeting & matters arising
- News
|
|
> > | |
|
- Reports - preparation for the OsC:
|
|
< < |
-
- ROBins (Fred, Andjei, Barry)
- ROS commissioning, sw & technical runs (Gordon, Andjei, Jiri, Ekrcan...)
|
> > |
-
- ROBins (Fred, Andrzej, Barry)
- ROS commissioning, sw & technical runs (Gordon, Andrzej, Jiri, Ekrcan...)
|
| |
|
< < | |
> > |
-
- Networks (Fred, Richard)
- TDAQ running on the GRID (Thorsten, Jiri)
|
|
-
- L2 Tracking (John, Dmitry, Erkcan...)
|
|
< < |
-
- Online integration (John, Jiri...)
- Monitoring (Paul, John...)
- HLT Steering (Simon, John...)
- Trigger configuration sw (Thorsten, Paul...)
|
> > |
-
- Timing results (John, Dmitry)
- Performance of Intel quad-core boxes (Fred)
- Monitoring (John, Paul...)
- HLT Steering (SimonG, John...)
- Trigger configuration sw (SimonH, Thorsten...)
|
|
-
- Trigger info in AOD and Physics analyses (Ricardo, Monika...)
- Trigger validation (Ricardo)
|
|
< < |
-
- Release schedule (Simon-offline, Jiri-HLT)
|
> > |
-
- Release schedule (SimonG-offline, Jiri-HLT)
|
|
- Finances including bids FJW + ...
- AOB
|
|
> > | |
|
-- NikosKonstantinidis - 17 Apr 2007
\ No newline at end of file |