Difference: T2UKMinutes-2006-08-31 (3 vs. 4)

Revision 42006-09-04 - NikosKonstantinidis

Line: 1 to 1
 
META TOPICPARENT name="T2UKMeetings"
ACTION: Fred to circulate a note with details of the bid for new build machines to the group leaders.

News

Changed:
<
<
Nikos commented on the report from the ATLAS-Uk OsC. It is generally positive, and they are particularly happy with the
>
>
Nikos summarised the report from the ATLAS-Uk OsC. It is generally positive, and they are particularly happy with the
 progress in the ROBins and the fact that the few failures are not due to a single design fault. They asked three specific things for the next meeting (which is on 03/11/2006 at CERN).
  • More details on the plan for acquisition of CPUs (and back-up plan in case the CPUs do not meet the specs we have been assuming in our calculations)
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback