Other Information/Links
- Final Design/Production Readiness Review
FDR/PRR Webpage
FDR/PRR Agenda - TIM Test Board
Schematics, Layout & Assembly (pdf)
(ps) Schematics, Layout, TopSilk, Netlist.
- TTC Information
TTCrq Manual
QPLL Manual 1.0
Timing Distribution at the LHC Document
Timing and Synchronization in the LHC Experiments Document
Timing, Trigger and Control (TTC) Systems for the LHC Document
- More of John Lanes Docs and Diags
Preliminary documentation here
SCT UCI (pdf)
SCT DPF (pdf)
TIM context diagram (pdf)
TIM functional model (pdf)
Timing flow of SCT TTC signals (pdf)
Timing of TIM output signals (pdf)
- Other Relevant pages
SCT Electronics
SCT home page
SCT and pixel off-detector shared page
ROD Backplane Document
BOC Homepage
BOC Preliminary Design
SCT RCC Documents
SCT ROD DAQ Wiki
ATLAS SCT Macro-Assembly DAQ/DCS Software
ATLAS at UCL
ATLAS SCT at UCL
UCL HEP Group
- Old (TIM-0)
Physical Setup (txt) TIM0.
Janet's photos of TIM-0: angle or above or front.
Copyright © 2003-2022 UCL HEP ATLAS Electronics Group (last modified 19 Apr 2022)